Petroknowledge

An Intensive 5 Day Training Course

Coiled Tubing Operations

Print this Course

Code Date Venue Fee($)
OG264 16 - 20 Jun 2019 Dubai - UAE 4,950

*All fees are exclusive of VAT


Why Choose this Training Course? 

Coiled Tubing is the process of running a reel of continuous tubing into a well that is still under pressure. Coiled Tubing equipment is portable and modular although modern reels are reaching high transport weights and offers quick rig-up times.

The maximum working depth of Coiled Tubing is usually determined by the amount of tubing that can be spooled onto a reel rather than the TVD. Highly deviated wells can cause problems with Coiled Tubing as, like wireline, gravity is required to keep the tubing moving down the well-bore. This can now be overcome to a certain extent with the use of downhole “tractors” which pull the coiled tubing from the bottom. Coiled Tubing can be used for a very wide range of jobs such as, Nitrogen lifting wells, Clean-up operations, Spotting acid at the perforations, fishing operations, Spotting cement and PLT.

This PetroKnowledge training course will highlight:


Training Objectives

What are the Goals? 

By the end of this PetroKnowledge training course, participants will learn to:

  • Manage and execute Coiled Tubing interventions
  • Increase overall operational performance during Coiled Tubing interventions
  • Select the most commonly used downhole tools and explain their function
  • Work safely with liquid nitrogen

Target Audience

Who is this Training Course for? 

This PetroKnowledge training course is designed for those involved in the production optimization and well intervention operations:

  • Production Technologists
  • Production Engineers
  • Operations Engineers
  • Field Technicians
  • Reservoir Engineers

Training Methods

How will this Training Course be Presented? 

This PetroKnowledge wire line operations and techniques training course will be presented using properly designed slides, some and animation on relevant issues. A printed manual containing all the slides and/or electronic form in PDF will be delivered to each attendant. Teaching methods include also pre and post evaluation test on related issues.

Organisational Impact

Organization will gain (direct and indirect) the following:  

  • Employees who receive training have increased confidence and motivations;
  • Lower cost of production –eliminates risks because trained personnel are able to make better
  • Lower turnover –brings a sense of security at the workplace which in turn reduces labor turnover
  • Change management –involvement of employees in the change process

Personal Impact

Personnel will gain the following: 

  • Manage and execute Coiled Tubing interventions
  • Increase overall operational performance during Coiled Tubing interventions
  • Select the most commonly used downhole tools and explain their function
  • Work safely with liquid nitrogen

Daily Agenda

Day One: Coiled Tubing Equipment 

  • Coiled Tubing Services
  • Coiled Tubing Equipment
  • Surface CT Equipment
  • Downhole Equipment

Day Two: Well Control Equipment 

  • Barrier theory
  • Primary, secondary and tertiary barriers
  • BOP types
  • Strippers
  • Riser and flange connections

Day Three: Coiled Tubing Application 

  • CT String and Pipe Management
  • Data Acquisition
  • Depth Control
  • CT Applications
  • Matrix Stimulation with CT
  • CT Logging
  • Nitrogen

 Day Four: Job Design 

  • Introduction to Job Design
  • Safety and Operational Standards
  • Job Design - Risk Analysis
  • Downhole Tools

Day Five: Acidizing and Stimulation Techniques 

  • Damage mechanisms
  • Chemistry of carbonate acidizing
  • Acid treatment design in carbonate
  • Fluid selection for carbonate acidizing
  • Chemistry of sandstone acidizing
  • Acid treatment design in sandstone
  • Fluids selection for sandstone acidizing
  • Additives used in acidizing and their functions
  • Case studies

Related Courses


Register Quick Enquiry Request an In-House Proposal

DMCA.com Protection Status

Home » Courses » Production & Operation Technology » Coiled Tubing Operations
PetroKnowledge Training


Coiled Tubing Operations


Code Date Venue Fees
OG264 16 - 20 Jun 2019 Dubai - UAE $4,950



Why Choose this Training Course? 

Coiled Tubing is the process of running a reel of continuous tubing into a well that is still under pressure. Coiled Tubing equipment is portable and modular although modern reels are reaching high transport weights and offers quick rig-up times.

The maximum working depth of Coiled Tubing is usually determined by the amount of tubing that can be spooled onto a reel rather than the TVD. Highly deviated wells can cause problems with Coiled Tubing as, like wireline, gravity is required to keep the tubing moving down the well-bore. This can now be overcome to a certain extent with the use of downhole “tractors” which pull the coiled tubing from the bottom. Coiled Tubing can be used for a very wide range of jobs such as, Nitrogen lifting wells, Clean-up operations, Spotting acid at the perforations, fishing operations, Spotting cement and PLT.

This PetroKnowledge training course will highlight:


Training Objectives

What are the Goals? 

By the end of this PetroKnowledge training course, participants will learn to:

Target Audience

Who is this Training Course for? 

This PetroKnowledge training course is designed for those involved in the production optimization and well intervention operations:

Training Methods

How will this Training Course be Presented? 

This PetroKnowledge wire line operations and techniques training course will be presented using properly designed slides, some and animation on relevant issues. A printed manual containing all the slides and/or electronic form in PDF will be delivered to each attendant. Teaching methods include also pre and post evaluation test on related issues.

Organisational Impact

Organization will gain (direct and indirect) the following:  

Personal Impact

Personnel will gain the following: 

Daily Agenda

Day One: Coiled Tubing Equipment 

Day Two: Well Control Equipment 

Day Three: Coiled Tubing Application 

 Day Four: Job Design 

Day Five: Acidizing and Stimulation Techniques 

Print Page

© 2019. Material published by Petroknowledge shown here is copyrighted.

All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.


Sending your message. Please wait...

Close

There was a problem sending your message. Please try again.

Please complete all the fields in the form before sending.

Download PDF

© 2019. Material published by Petroknowledge shown here is copyrighted.

All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.


Sending your message. Please wait...

Download PDF Click here to download PDF file Close

There was a problem sending your message. Please try again.

Please complete all the fields in the form before sending.

Download The Complete PetroKnowledge Training Schedules Here